Timber Kit Solutions Ltd are manufacturers and installers of timber frames for residential and commercial buildings.

Our projects range from simple residential extensions to 20 unit housing developments, from individual self build homes to complete new apartment blocks, from care home extensions to complete new-build for commercial buildings.

We work mainly in the Shropshire, Cheshire, West Midlands and Mid Wales area, but also further afield throughout the UK.
 

 

Montgomery Way, Sundorne, Shrewsbury; mixed social housing

Timber Frame commencement date: June 09
Consists of 20 No. Units, 3 of which are detached dwellings.

Special Project info:
A) Ground floor constructed using pre-insulated timber joist cassettes on strip footings to reduce cart away from foundation dig.

 

Mill Lane, Kidderminster; 3 storey apartment building

Timber Frame commencement date: May 09 this project is a 3 storey block of apartments, containing 9 units in total.

Special Project info:
A) External walls comprising of 140mm External studwork with high performance breather membrane.
B) Compartment floors being constructed to Robust Detail EFT-2.

 

Preston Nook, Nr. Chorley; individual architect-designed home

Timber Frame commencement date: May 09 a one off bespoke design tailored to our clients requirements.

Special Project info:
A) Metal web floor joists used which enables easy installation of services.
B) Steel frame installed to porch area, ready to take a purpose made oak frame.

 

Wylecop Street, Dinas Mawddyw, Powys; terrace of 3 houses

Timber Frame commencement date: June 09 construction of 3 new dwellings for a housing association

Special Project info:
A) Building to be clad in timber boarding by main contractor.
B) Robust Party Walls built to EWT-1 detail (which offers 2 extra credits for Code for Sustainable Homes).

 

Leabrook Road, Tipton; Two storey nursing home extension

Timber Frame commencement date: July 09 two storey nursing home extension

Special Project info:
A) Allowance made in design for future hoist connections in floor joists and roof trusses
B) Metal web floor joists used to create flat roof structure at rear end of extension

 

Upper Church Lane, Tipton; 2/3 storey apartment building

Timber Frame commencement date: August 09 consists of 1 large block, containing 9 apartments

We were contracted to supply and erect the timber frame structure, including compartment floors, which required a return visit to site as soon as the building was made water-tight.

Special Project info:
A) Masonite engineered joists used for first and second floor platforms.
B) Compartment floors constructed in accordance with Robust Detail EFT-1.

 

Parkfield Road, Stourbridge; 3 storey apartment building

Timber Frame commencement date: November 09
Consists of 1 large block, containing 16 apartments

Special Project info:
A) Masonite engineered joists used for first and second floor platforms.
B) Compartment floors constructed in accordance with Robust Detail EFT-1
C) Design to 'Lifetime Homes' requirements.

 

Grove Road, Stalybridge; Phase 1, 3 storey apartment building

Timber Frame commencement date: July 8th 2010

3 Storey apartment block, containing 18 units.

Special Project info:
A) First and second floor joists installed in cassette form for speed of build.
B) Roof trusses pre-assembled on second floor deck, and lifted into place in sections.
B) Total timber frame build programme - 11 days from delivery to sign off.

 

Grove Road, Stalybridge; Phase 2, 4 storey apartment building

Timber Frame commencement date: November 2010
4 Storey apartment block, containing 36 units.

Special Project info:
A) First, second and third floor joists installed in cassette form for speed of build.
B) Roof trusses pre-assembled on third floor deck, and lifted into place in sections.
B) Total timber frame build programme - 28 days from delivery to sign off.

 

Roman Road, Leintwardine; 20 no. Social Housings units

Timber Frame commencement date: March 2011
Project consists of 20 No. Units.

Special Project info:
A) Ground floor constructed with pre-insulated timber joist cassettes on strip footings to reduce cart away from foundation dig, and to provide cost effective alternative to block and beam construction.

B) Party walls built in accordance with Robust Detail EWT-1, for additonal CSH credits.

 

Waseley Hill Farm, Nr. Halesowen; One-off bespoke project

Timber Frame commencement date: August 2011
One off bespoke project

Special Project info:
A) Front and rear air-dried oak frames with central vaulted ceiling.
B) Metal web floor joists supplied for easy installation of services.
C) Bespoke design with curved steel link landing.

 

Callow End, Worcestershire; One-off bespoke project

Timber Frame commencement date: February 2012

Special Project info:
A) Vaulted ceilings at first floor.
B) Metal web floor joists supplied for easy installation of services.
C) Structural oak posts to support first floor cantilever.